Difference between revisions of "Action items from 05/03/07 call"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
*Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft. | *Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft. | ||
− | *Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2. | + | *Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2). |
Revision as of 09:55, 3 May 2007
Go back to CTO:Main Page
- Review term lists and Jennifer’s shot at placing terms into OBI categories (download the May 3 excel file to manipulate the term lists and add your comments).
- Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft.
- Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2).